Very often, during a move or when a malfunction occurs, people face a difficult task, because
Preparatory work It is necessary to perform a number of preparatory work before laying pipes for a warm water floor.
Purpose and properties The plasticizer is included in almost all building mixtures. High-quality underfloor heating screed
Circulation pump device Grundfos Grundfos circulation pump for home heating system Po
Soldering the cooling radiator 1). First of all, we need to remove the radiator. In a special container
Water connection Installation of instantaneous water heater. We clamp a metal-plastic pipe into the water distributor and with
Modern balconies have long ceased to be a storage room for unnecessary things and old trash. Much more expedient
SNiP requirements Any construction work, including the installation of heating radiators, is carried out in
Is it possible to insulate the balcony with foam In the construction of residential premises, foam is not recommended for
Underfloor heating malfunctions An infrared underfloor heating system malfunction is an unlikely but possible event. Most often